An ADU conversion turns existing square footage, usually a garage or an underused interior space, into a self-contained dwelling with its own kitchen and bathroom. Those two rooms are the entire reason the conversion is more than a remodel, and they are what we build. The framing and drywall of a conversion are ordinary work. Running a full waste line to a new bathroom, feeding a second kitchen, and separating the services well enough for the unit to function independently is not. Utilities decide this project. A garage sitting on a slab with no plumbing in it needs waste routed to the existing sewer connection, which means cutting concrete and establishing fall to the main. Whether that is straightforward or difficult depends on where the garage sits relative to the house and where the sewer lateral runs. Electrical usually means a subpanel. The permit path varies by jurisdiction across our service area more than any other work we do. Inside Tulare it runs through the Building Division. Out in Goshen, which is unincorporated, it goes to the Tulare County Resource Management Agency instead. Farmersville adopted its own ADU Ordinance No. 523, so applications there follow that pathway. Knowing which set of rules applies to your parcel is the first thing to establish, not the last.
We scope the kitchen and bathroom build inside the conversion, and we work alongside whoever is handling the shell and the structural side where that is a separate trade. The sequence is plan approval, then underground plumbing and slab work, rough trades, inspection, insulation and drywall, then the kitchen and bath finish work in the same order as any remodel. The written scope states which jurisdiction the permit goes through, what utility work is included, and the fixture and appliance schedule for both rooms.

Establishes whether the garage or room can meet habitable-space requirements.
Determines how water, waste, gas and power reach the new unit.
Covers the two rooms that make the converted space an independent dwelling.
Proudly serving Tulare, Dinuba, Exeter, Farmersville, Lindsay and Goshen for years.
Ten kinds of work, all of it inside a bathroom or a kitchen. A tub-to-shower conversion in an existing footprint and a kitchen that moves the sink are not comparable jobs, so they are scoped, permitted and priced separately. Start with the one that matches your room.

Dinuba runs its own water and sits in Pacific Gas and Electric territory. Exeter, Farmersville and Lindsay are all on Southern California Edison. Goshen has no city hall at all, so its permits go through the county. Those differences change the schedule before a single tile gets ordered.
Frequently Asked Questions
Kitchen and Bathroom Remodeling can be complex, and we’re here to provide answers to common questions. Here are some frequently asked questions from our clients.
There is no single price for a bathroom remodel in Tulare. Cost follows whether the fixtures stay in their existing locations, whether the supply and waste lines behind the wall get replaced, and what the permit scope turns out to be. A tile and fixture refresh in an existing footprint and a remodel that relocates the drain are not comparable jobs. We price after a walkthrough, not before.
Cosmetic work like tile, paint and a like-for-like fixture swap generally does not, but anything that moves or adds plumbing, electrical or mechanical work does. Permits inside the city go through the Building Division at Tulare City Hall on Kern Avenue. We pull the permit and meet the inspector rather than leaving that to you.
Schedule follows the permit and inspection sequence, whether the sink and range move, and lead times on cabinets and stone. Cabinet and counter orders are usually the long pole, and stone gets templated only after the cabinets are set. A refresh in the existing layout and a kitchen that relocates the plumbing run on very different calendars.
Demolition to the studs, any plumbing and electrical corrections the inspector will require, waterproofing, tile, the fixtures and vanity, glass, and the final inspection. What varies is how much of the plumbing behind the wall gets replaced while it is open. In older Tulare houses that is usually the part worth doing, because the wall is only open once.
Ask who pulls the permit and who meets the inspector, and get the answer in writing. Ask what happens to the price if the wall opens up worse than expected, because on houses of this age it sometimes does. A contractor who has scoped the job properly can tell you where the plumbing runs before demolition, not after.
Look for someone who does these two rooms often enough to know what is behind the walls in your part of town, and who will put the permit path in the written scope. Ask whether one crew stays on the job from demolition to final inspection or whether it changes hands. Ask for addresses of finished work in Tulare County you can drive past.
The utility work drives it more than the square footage does. A space that already has plumbing nearby and a panel with capacity is the cheaper version. Cutting a slab to run waste, establishing fall to the sewer lateral and adding a subpanel is the expensive version. The kitchen and bathroom specifications then move the number from there.
Often, and the questions are whether the structure can meet habitable-space requirements and whether utilities can reach it practically. Ceiling height, egress and insulation all get examined. Where the sewer lateral runs relative to the garage matters as much as anything about the building itself.
No, and this catches people out: inside the city it goes through the Building Division. Goshen is unincorporated, so it goes to the Tulare County Resource Management Agency instead. Farmersville adopted its own ADU ordinance with a separate pathway. We confirm which applies to your parcel before any drawings are made.
A self-contained dwelling needs independent living, sleeping, cooking and sanitation. In practice that means a functioning kitchen and a full bathroom, which is where most of the cost and all of the inspections land. Those two rooms are what turn a converted garage into a legal unit rather than a finished garage.
Scope Your Tulare ADU Conversion
We pride ourselves on delivering great results and experiences for each client. Hear directly from home and business owners who’ve trusted us with their Kitchen and Bathroom Remodeling needs.

My mother could not step over the tub anymore, so we had them convert it to a walk-in shower. Our house in Historic West Tulare is one of the old ranch builds and the drain was not where anyone expected. They found it on the walkthrough, told us what it would add, and it still finished the week they said it would.
Alicia R.

We moved the sink and the range in our kitchen remodel, which turned out to mean a plan check and a panel upgrade neither of us had budgeted for. They walked the whole thing through the Building Division and handled the inspections. No surprises after the scope was signed, which is not what I expected going in.
Ramon G.

We asked about new counters and full cabinets. They looked at the boxes, said the cabinets were solid and only the doors were tired, and quoted refacing instead. That was a smaller job than the one we came in asking for. We used the difference on the tile.
Deanna V.
Ready to hear more about expert services at ?
Contact us today to receive a detailed, no-obligation quote.