A tub-to-shower conversion keeps the existing alcove and turns it into a shower, which makes it the least invasive way to get out of a tub. The tub comes out, the surround comes off, and what is behind it decides the rest of the job. In houses of the age that fill much of Tulare, the wall behind a tub surround has frequently been damp for a long time. Sometimes that is confined to the surface. Sometimes the framing needs work and the supply lines are due. Neither is a disaster, but both are the reason we will not quote this job over the phone. The drain is the second question. A tub drain can often be adapted to serve a shower pan without relocation, which keeps the floor closed and the permit simple. When it cannot, the slab gets cut and the job changes category. The third decision is one people wish they had made earlier: blocking. If there is any chance of a grab bar or a fold-down seat later, the framing for it goes in now while the wall is open, because adding it afterward means opening finished tile. It costs very little at this stage and it is the single most common regret on a finished conversion.
The build runs demolition, wall repair if the framing needs it, plumbing, inspection where one applies, waterproofing, tile, then glass or a curtain rod. Because the alcove already exists, this job usually finishes faster than a full bathroom remodel and disrupts less of the house. The written scope states what we found behind the surround, whether the drain is being reused, whether blocking is going in, and what the waterproofing assembly is. Anything discovered behind the wall gets shown to you before it is repaired.

Reveals what the tub surround was hiding once the old unit comes out.
Decides whether the floor stays closed or the slab gets opened.
Adds framing behind the tile so hardware can be mounted later.
Proudly serving Tulare, Dinuba, Exeter, Farmersville, Lindsay and Goshen for years.
Ten kinds of work, all of it inside a bathroom or a kitchen. A tub-to-shower conversion in an existing footprint and a kitchen that moves the sink are not comparable jobs, so they are scoped, permitted and priced separately. Start with the one that matches your room.

Dinuba runs its own water and sits in Pacific Gas and Electric territory. Exeter, Farmersville and Lindsay are all on Southern California Edison. Goshen has no city hall at all, so its permits go through the county. Those differences change the schedule before a single tile gets ordered.
Frequently Asked Questions
Kitchen and Bathroom Remodeling can be complex, and we’re here to provide answers to common questions. Here are some frequently asked questions from our clients.
There is no single price for a bathroom remodel in Tulare. Cost follows whether the fixtures stay in their existing locations, whether the supply and waste lines behind the wall get replaced, and what the permit scope turns out to be. A tile and fixture refresh in an existing footprint and a remodel that relocates the drain are not comparable jobs. We price after a walkthrough, not before.
Cosmetic work like tile, paint and a like-for-like fixture swap generally does not, but anything that moves or adds plumbing, electrical or mechanical work does. Permits inside the city go through the Building Division at Tulare City Hall on Kern Avenue. We pull the permit and meet the inspector rather than leaving that to you.
Schedule follows the permit and inspection sequence, whether the sink and range move, and lead times on cabinets and stone. Cabinet and counter orders are usually the long pole, and stone gets templated only after the cabinets are set. A refresh in the existing layout and a kitchen that relocates the plumbing run on very different calendars.
Demolition to the studs, any plumbing and electrical corrections the inspector will require, waterproofing, tile, the fixtures and vanity, glass, and the final inspection. What varies is how much of the plumbing behind the wall gets replaced while it is open. In older Tulare houses that is usually the part worth doing, because the wall is only open once.
Ask who pulls the permit and who meets the inspector, and get the answer in writing. Ask what happens to the price if the wall opens up worse than expected, because on houses of this age it sometimes does. A contractor who has scoped the job properly can tell you where the plumbing runs before demolition, not after.
Look for someone who does these two rooms often enough to know what is behind the walls in your part of town, and who will put the permit path in the written scope. Ask whether one crew stays on the job from demolition to final inspection or whether it changes hands. Ask for addresses of finished work in Tulare County you can drive past.
It depends on what is behind the tub surround and whether the drain can be reused. Reusing the drain in a sound alcove is the straightforward version. Framing repair or a relocated drain moves it up. Tile selection and whether you want glass or a curtain then account for most of the remaining spread.
Usually, because the alcove, the vanity and the floor stay where they are and only one wet area is rebuilt. The saving disappears if the wall behind the tub has been leaking long enough to need framing work. We can tell you which situation you are in once the surround is off, and we show you before we repair it.
Put the blocking in even if you do not want the bars yet. Blocking is framing added behind the tile so hardware can be mounted securely later, and while the wall is open it costs very little. Adding it after the tile is finished means cutting into the finished wall. This is the most common thing homeowners wish they had done.
It depends on how many bathrooms the house has. Converting the only tub in a family home removes an option some buyers want. Converting one of two, or a primary bathroom in a house that has a tub elsewhere, rarely raises the same concern. We will say so during the walkthrough if we think the tub is worth keeping.
Convert Your Tulare Tub to a Shower
We pride ourselves on delivering great results and experiences for each client. Hear directly from home and business owners who’ve trusted us with their Kitchen and Bathroom Remodeling needs.

My mother could not step over the tub anymore, so we had them convert it to a walk-in shower. Our house in Historic West Tulare is one of the old ranch builds and the drain was not where anyone expected. They found it on the walkthrough, told us what it would add, and it still finished the week they said it would.
Alicia R.

We moved the sink and the range in our kitchen remodel, which turned out to mean a plan check and a panel upgrade neither of us had budgeted for. They walked the whole thing through the Building Division and handled the inspections. No surprises after the scope was signed, which is not what I expected going in.
Ramon G.

We asked about new counters and full cabinets. They looked at the boxes, said the cabinets were solid and only the doors were tired, and quoted refacing instead. That was a smaller job than the one we came in asking for. We used the difference on the tile.
Deanna V.
Ready to hear more about expert services at ?
Contact us today to receive a detailed, no-obligation quote.